PM SURYA GHAR MUFT BIJLI YOJANA: Claim ₹1,30,800 Subsidy + 300 Units/Month Free Power. Zero Down Payment Available. Verify Eligibility →
Sahu Innovation Logo SAHU INNOVATION
Meticulous Architectural Execution

The 11-Stage Solar Pipeline.

Our transparent, end-to-end operational workflow ensures every project transitions seamlessly from initial document intake to direct government subsidy credit and 25-year performance monitoring.

01
01

Digital Document Intake

We collect your basic identity records (Aadhaar, PAN, Bank Passbook, electric bill, and Jamabandi receipt) to prepare formal government subsidy registration.

02
02

Field Surveyor Site Inspection

Our certified field surveyor visits your property to capture the required GPS photo of your home and inspect roof structural integrity and shading profiles.

03
03

DISCOM Net Meter Feasibility

We liaise directly with your local electricity distribution company (DISCOM) to submit and lock formal technical feasibility approval for net metering.

04
04

Architectural & Structural Design

Our engineering team custom-designs your flush-mounted array layout to harmonize perfectly with your building facade and structural wind loads.

05
05

PM Surya Ghar Subsidy Locking

We register your verified application on the national portal, reserving your exact central (`₹85,800`) and state (`₹45,000`) subsidy credits (`Total ₹1.3L`).

06
06

Zero-Down EMI / Financing

If selected, our banking partners process your zero-down payment EMI plan (~₹2,100/mo), aligning installments with your monthly utility bill savings.

07
07

Grade-A Hardware Staging

Direct dispatch of Tier-1 monocrystalline PERC solar modules and high-efficiency hybrid/on-grid inverters to your installation address.

08
08

Precision Installation

Our master technicians execute flush-mounted installation, marine-grade cabling, and weatherproof conduit sealing without disturbing roof aesthetics.

09
09

DISCOM Joint Inspection & PCR

Formal joint inspection with DISCOM officers, installation of bi-directional net meter, and upload of Project Completion Report (PCR).

10
10

Direct Passbook Subsidy Disbursal

Within 30 days, your central credit (`₹85,800`) is deposited directly into your bank passbook account, followed by state credit (`₹45,000`).

11
11

25-Yr Monitoring & 5-Yr Agreement

Ongoing real-time generation tracking plus total coverage under our signed 5-Year Vendor Protection Agreement.